制定项目详细操盘实施计划,凭借体制力量和资源优势,将项目用地通过法定图则调整为C类商业用地,拟更新方向调整为“工改商”;
通过操盘经验在保有商业用地性质的基础上,通过提容增效等方式提高规划容积率至3.3
1、项目用地规划为现状保留工业用地(M1),城市更新方向只能是普通“工改工”。
2、项目位于长流陂水库水源保护区,严格限制建设,规划容积核定2.0。
The planning of the project land is to reserve the industrial land (M1) in the current situation, and the urban renewal direction can only be ordinary "industry to industry"
The project is located in the water source protection
area of changliupi reservoir. The construction is strictly restricted and the planned volume is 2.0.